|
dsc09039
Port side done after cure.
Date: 01/23/2013
Views: 7546
|
|
|
dsc09056
Wetting out stbd side.
Date: 01/24/2013
Views: 6922
|
|
|
p1000711
p1000711.jpg
Date: 03/12/2012
Views: 5725
|
|
|
dsc08966
Port side LG socket hole.
Date: 10/01/2012
Views: 9477
|
|
|
dsc09063
Hey Bill!
Date: 01/24/2013
Views: 7231
|
|
|
p1000723
p1000723.jpg
Date: 03/12/2012
Views: 6043
|
|
|
dsc09046
Making a layup schedule for rib 1.
Date: 01/23/2013
Views: 7436
|
|
|
nex_2014_01_12_02
Rat's tail rasp works great here.
Date: 01/13/2014
Views: 6201
|
|
|
dsc08962
Stb side. Need to do some clean up...
Date: 10/01/2012
Views: 10331
|
|
|
20160403_160443.jpg
20160403_160443.jpg
Date: 04/03/2016
Views: 12327
|
|
|
dsc08399
Atempting to remove the mass ballance brace but to only find out later that it is bonded at the top.
Date: 03/25/2012
Views: 8654
|
|
|
dsc08617
After removing the green tape.
Date: 04/14/2012
Views: 56108
|
|
|
DSC08801
starboard side
Date: 06/05/2012
Views: 8650
|
|
|
dsc08600
Thinking of modifying the mono wheel trailer as a jig to perform the tri-gear conversion.
Date: 04/10/2012
Views: 12490
|
|
|
nex_2014_01_25_32
nex_2014_01_25_32.jpg
Date: 01/26/2014
Views: 7926
|
|
|
p1000724
p1000724.jpg
Date: 03/12/2012
Views: 6684
|
|
|
Orange part created in turbocad and printed on a 3D printer from ABS. Printer is a Prusa i3 X, cost is around $300.
Orange part created in turbocad and printed on a 3D printer from ABS. Printer is a Prusa i3 X, cost is around $300.
Date: 04/03/2016
Views: 17604
|
|
|
dsc09021
BIG THANK YOU to my Uncle Kim Prout for flying out to help me with getting the gear legs set. He also helped me slow down and plan ahead. As an excited new builder its easy to get in a rush to try achieve something tangible. Im sure after that week of b
Date: 01/22/2013
Views: 7518
|
|
|
nex_2014_01_25_04
Bill helping hoist the aircraft up to remove the jig.
Date: 01/25/2014
Views: 6466
|
|
|
nex_2014_01_12_07
Port side.
Date: 01/13/2014
Views: 6363
|
|