Login
EuropaOwners Random Items
Advanced Search

Random Images

IMG_2118

IMG_2118

Date: 12/13/2004 Views: 7513

DSCF0037_001

DSCF0037_001

Date: 09/08/2009 Views: 5361

IMG_0249

IMG_0249

Date: 02/12/2006 Views: 6483

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 861679

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 861679

Random Items

Date: 05/23/2026
Owner: Guest
Size: 84 items
nextlast
dsc09029

dsc09029

Gear legs clamped in place, no toe in/out per Bud. You cant see it in the photo but I used a green tip .30 bullet as a homemade plum bob that was attached to dead center of the aluminum angle. This helped us keep the guide over the center line. Oh make

Date: 01/22/2013
Views: 21145
Add Photo To Cart
dsc08399

dsc08399

Atempting to remove the mass ballance brace but to only find out later that it is bonded at the top.

Date: 03/25/2012
Views: 30863
Add Photo To Cart
p1000688

p1000688

p1000688.jpg

Date: 03/12/2012
Views: 12980
Add Photo To Cart
dsc09049

dsc09049

Layup Port side complete with peel ply. Notice the glad wrap to keep air from getting under the peel ply. 420 = 46g, aeropoxy ~ 200g

Date: 01/24/2013
Views: 20710
Add Photo To Cart
dsc09071

dsc09071

Uncle Kim glassing in Rib 2.

Date: 01/26/2013
Views: 20211
Add Photo To Cart
p1000696

p1000696

p1000696.jpg

Date: 03/12/2012
Views: 13389
Add Photo To Cart
dsc09040

dsc09040

The gap from the bottom of the socket and the belly is as you see. The only way to get it all the way down was to lower the belly to 15" which was not considered an option. Belly hight is 16.0" with the axle width at 82.50" and axle cent

Date: 01/23/2013
Views: 20981
Add Photo To Cart
dsc08610

dsc08610

Whats missing?

Date: 04/10/2012
Views: 29451
Add Photo To Cart
p1000637

p1000637

p1000637.jpg

Date: 02/14/2012
Views: 13007
Add Photo To Cart
p1000473

p1000473

p1000473.jpg

Date: 12/13/2011
Views: 27934
Add Photo To Cart
dsc08662

dsc08662

The 10“ diameter from the pilot hole.

Date: 04/22/2012
Views: 26402
Add Photo To Cart
p1000693

p1000693

p1000693.jpg

Date: 03/12/2012
Views: 12813
Add Photo To Cart
p1000730

p1000730

p1000730.jpg

Date: 03/12/2012
Views: 12984
Add Photo To Cart
nex_2013_08_24_06

nex_2013_08_24_06

Time for some clean up.

Date: 08/25/2013
Views: 18284
Add Photo To Cart
dsc08961

dsc08961

Stb side two layers bid 10" and 8" peel ply removed

Date: 10/01/2012
Views: 24800
Add Photo To Cart
dsc09050

dsc09050

Stbd. side ready for the bid.

Date: 01/24/2013
Views: 18893
Add Photo To Cart
nex_2014_01_25_01

nex_2014_01_25_01

Starboard side after Uni over ribs 3 and 4. Added Bid on the X to reinforce the cuts needed to get the Uni to lay flat. Also filled in Rib 1 air buble.

Date: 01/25/2014
Views: 19688
Add Photo To Cart
dsc09054

dsc09054

Wetting out stbd side.

Date: 01/24/2013
Views: 19143
Add Photo To Cart
p1000635

p1000635

p1000635.jpg

Date: 02/14/2012
Views: 13283
Add Photo To Cart
p1000615

p1000615

p1000615.jpg

Date: 01/29/2012
Views: 21874
Add Photo To Cart
nextlast
Page: 1 2 3 4 5
Powered by Gallery v2.3