|
|
BID trimmed.
Date: 01/25/2010
Views: 7147
|
|
|
Slightly better shot.
Date: 01/25/2010
Views: 7126
|
|
|
|
Near joint is attachment to radio layup.
Date: 01/25/2010
Views: 6320
|
|
|
Starboard bracket fastened to instrument module.
Date: 01/25/2010
Views: 6123
|
|
|
|
Vertex handheld antenna being inserted in tube 1.
Date: 01/25/2010
Views: 7921
|
|
|
Vertex handheld antenna being inserted in tube 2.
Date: 01/25/2010
Views: 6773
|
|
|
|
Starboard bracket mount on top of footwell.
Date: 01/25/2010
Views: 7014
|
|
|
Larger screw, vise grip kluge and persuader did trick.
Date: 01/25/2010
Views: 7942
|
|
|
|
Drilled hole for #4 screw, but it pulled out.
Date: 01/25/2010
Views: 6548
|
|
|
Antenna holder/stengthening tube install begins.
Date: 01/20/2010
Views: 7880
|
|
|
|
Port bottom strengthening.
Date: 01/20/2010
Views: 7860
|
|
|
1 BID front.
Date: 01/21/2010
Views: 6994
|
|
|
|
Most forward joint 1 BID.
Date: 01/21/2010
Views: 7953
|
|
|
2 BID back.
Date: 01/21/2010
Views: 6689
|
|
|
|
Permagrit file NG.
Date: 01/21/2010
Views: 6276
|
|
|
Magnets and JB KWIK Weld.
Date: 01/21/2010
Views: 6378
|
|
|
|
Blood sampling test tubes to rescue.
Date: 01/23/2010
Views: 6662
|
|
|
Just a tad over an oz.
Date: 01/20/2010
Views: 6869
|
|
|
|
Ron and Alan took turns working on starboard bracket.
Date: 01/20/2010
Views: 8302
|
|
|
Required spacing floxed in.
Date: 01/20/2010
Views: 7285
|
|