|
BID trimmed.
Date: 01/25/2010
Views: 6139
|
|
|
Slightly better shot.
Date: 01/25/2010
Views: 6246
|
|
|
Near joint is attachment to radio layup.
Date: 01/25/2010
Views: 5407
|
|
|
Starboard bracket fastened to instrument module.
Date: 01/25/2010
Views: 5239
|
|
|
Vertex handheld antenna being inserted in tube 1.
Date: 01/25/2010
Views: 6577
|
|
|
Vertex handheld antenna being inserted in tube 2.
Date: 01/25/2010
Views: 5883
|
|
|
Starboard bracket mount on top of footwell.
Date: 01/25/2010
Views: 6097
|
|
|
Larger screw, vise grip kluge and persuader did trick.
Date: 01/25/2010
Views: 6880
|
|
|
Drilled hole for #4 screw, but it pulled out.
Date: 01/25/2010
Views: 5577
|
|
|
Antenna holder/stengthening tube install begins.
Date: 01/20/2010
Views: 6850
|
|
|
Port bottom strengthening.
Date: 01/20/2010
Views: 6586
|
|
|
1 BID front.
Date: 01/21/2010
Views: 5873
|
|
|
Most forward joint 1 BID.
Date: 01/21/2010
Views: 6782
|
|
|
2 BID back.
Date: 01/21/2010
Views: 5765
|
|
|
Permagrit file NG.
Date: 01/21/2010
Views: 5394
|
|
|
Magnets and JB KWIK Weld.
Date: 01/21/2010
Views: 5553
|
|
|
Blood sampling test tubes to rescue.
Date: 01/23/2010
Views: 5648
|
|
|
Just a tad over an oz.
Date: 01/20/2010
Views: 5884
|
|
|
Ron and Alan took turns working on starboard bracket.
Date: 01/20/2010
Views: 7045
|
|
|
Required spacing floxed in.
Date: 01/20/2010
Views: 6414
|
|