|
|
Vertex handheld antenna being inserted in tube 2.
Date: 01/25/2010
Views: 6444
|
|
|
Jeff Baby Blue 2.
Date: 10/29/2004
Views: 8686
|
|
|
|
Lower port insert firewall connector 2.
Date: 09/08/2010
Views: 6437
|
|
|
Population complete 3.
Date: 08/08/2010
Views: 7450
|
|
|
|
Near joint is attachment to radio layup.
Date: 01/25/2010
Views: 6004
|
|
|
Pneu. tube abraision resistance 2.
Date: 06/08/2010
Views: 6797
|
|
|
|
First form fitted 1/8" ply ready to be floxed.
Date: 01/11/2010
Views: 6289
|
|
|
Paul's headset jacks 3.
Date: 02/21/2010
Views: 4809
|
|
|
|
Pneu. tube abraision resistance 6.
Date: 06/10/2010
Views: 5799
|
|
|
Mid panel insert 8.
Date: 11/17/2010
Views: 6160
|
|
|
|
Amp HDM-20 15 pin D-subs.
Date: 11/14/2010
Views: 7170
|
|
|
Now the screw head of handle hits module.
Date: 01/25/2010
Views: 6526
|
|
|
|
First pass cutout.
Date: 07/19/2010
Views: 5343
|
|
|
Panel population 1.
Date: 03/01/2010
Views: 6403
|
|
|
|
Port bracket, front side of firewall.
Date: 01/25/2010
Views: 5866
|
|
|
Stick selector panel mounting 2.
Date: 08/08/2010
Views: 7481
|
|
|
|
Planning panel 1.
Date: 10/29/2007
Views: 15216
|
|
|
Single point ground 1.
Date: 04/18/2009
Views: 6307
|
|
|
|
Overall shot and description.
Date: 01/25/2010
Views: 6267
|
|
|
First ply being held flat, then a bit of heat added.
Date: 01/11/2010
Views: 6571
|
|