Spar clamp that allows a little fore and aft movement
Date: 11/27/2013
Views: 9813
DSCF0635
Date: 07/28/2003
Views: 10913
41aileron_drive_jig
Date: 12/31/1969
Views: 4033
Newest Image
EAA SITE
Date: 08/23/2023
Views: 862415
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 862415
Port front spacer perfectly bonded in position.
Port front spacer perfectly bonded in position. Just need to remove double sticky tape.
Needed to Dremel out some areas of rebate, perhaps removed half of the fiberglass. Will strengthen with 2 BID from the bottom.
Used Dremel with both a Rotozip tool and long slender Tungsten Carbide grit to shape both port front and aft tang rebate area.
Y9-10-14