Trying not to mar flap cross tube too bad with Upstops 6 of 7
Date: 12/26/2013
Views: 6750
DSC00166_Texted
Date: 12/31/1969
Views: 3371
Newest Image
EAA SITE
Date: 08/23/2023
Views: 137248
Most Viewed Image
Wing fillet fairing
Date: 05/23/2007
Views: 547295
Starboard and Port Bucket 3 of 4.
First thing is to position your 2 x 6 perpendicular to the handle (see Starboard and Port Bucket build 1 of 3.). In other words make sure the handle is directly above the end-grain of the 2 x 6.
Using 1" or 1+1/2" Sheetrock screws, put a washer under the head of each screw and attach the Bucket to the 2 x 6 (screws and washers are positioned inside of the Bucket going into the 2 x 6) with four screws. Locate the screws ~ 1" inboard from the walls of the Bucket, 3" from each other and centered on the 2 x 6.