Login
EuropaOwners Random Items Archer_3
Advanced Search
View Slideshow (Fullscreen)

Random Items

1. ELT_BNC_90_3 2. Strobe_2 3. ELT_BNC_90_4 4. Transponder_1 5. Archer_3 6. Vertex_ant_10 7. E_install_6 8. Vertex_ant_9 ... 66. Archer_Troy_1

Random Images

032702_fuelline_cover

032702_fuelline_cover

Date: 12/31/1969 Views: 3902

26102008221_G

26102008221_G

Date: 09/14/2009 Views: 5889

DSC_0288

DSC_0288

Date: 05/15/2008 Views: 5662

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 834766

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 834766

Archer_3

Since you can't easily get to connections after fin is complete, trying to do the best job we know how.
Nylon screws have a dab of JB KWIK to keep nuts in place (they were scuff sanded).
Middle stud has a phospher bronze washer between nut and aluminium. Since it's squeezing on phonelic, had concerns that tension may loosen, so made a fillet of non corrosive silicone to seal edges.
End stud has a phospher bronze washer under head of screw squeezing on bottom of E aluminium. In event we ever needed to get at connections (drill acess hole in starboard fin), heads of screws are scuff sanded and bedded in Redux/flox to keep them from turning. It also serves to seal edges of connection on bottom head of screw and E aluminium, as this stud also has phonelic in joint.
Y9-04-25

Date: 04/25/2009
Size:
Full size: 2592x1944
nextlast
first previous
Archer_3

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/4.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Sat 25 Apr 2009 11:07:23 AM UTC
nextlast
first previous
Powered by Gallery v2.3