Login
EuropaOwners Random Items Front Port fuse stiffening for lift socket 3.
Advanced Search
View Slideshow (Fullscreen)

Random Items

1. Bonding... 2. Front Port ... 3. Making... 4. FL22 and W25. 5. Making... 6. Tapping... 7. Smooth... ... 84. Bonding of ...

Random Images

DSC00861

DSC00861

Date: 04/15/2005 Views: 9612

Making awful fit of lift pads correct 12.

Making awful fit of lift pads correct 12.

Date: 10/12/2010 Views: 7499

P1160024

P1160024

Date: 12/31/1969 Views: 8634

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 804489

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 804489

Front Port fuse stiffening for lift socket 3.

Foam is Floxxed in place. We taped 3M 375 to either side of the foam to make wetting out and flox cleanup a breeze. We then wet out for the 3 BID layup.
Alan had to disassemble our fixture, (reversing the parts), to make it a mirror of what was needed for the Starboard side.
This time we put tape on the shiny side of the ruler, (it didn't stick).
Y10-11-06

Date: 11/05/2010
Size:
Full size: 1800x1350
Front Port fuse stiffening for lift socket 3.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/2.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Sat 06 Nov 2010 12:02:49 AM UTC
Powered by Gallery v2.3