Fit baggage bay bulkhead - floor before fitting fairings Frans
Date: 12/08/2010
Views: 7262
Klaus-Building-His-Plane
Date: 10/20/2009
Views: 31768
imm030_31A
Date: 09/03/2009
Views: 10650
Newest Image
EAA SITE
Date: 08/23/2023
Views: 831038
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 831038
Sternpost bonding 2.
Sternpost gets a final wake up 36 grit, then 80 grit scuff sanding. The center rib needed to be lowered so as to not bulge fin too much, thats why it has a wide scuffing.
Y9-05-08