Date: 12/31/1969 Views: 18176
Date: 11/29/1999 Views: 6943
Date: 08/12/2003 Views: 10174
Date: 08/23/2023 Views: 789667
Port side bonded in place after tapping aluminium ring, and inserting cut down, scuff sanded and wet out with Redux 4-40 100 degree flat head screws. Screw heads and edge of aluminium ring packed with Redux/flox.