Date: 12/31/1969 Views: 4009
Date: 10/24/2004 Views: 6010
Date: 12/31/1969 Views: 4151
Date: 08/23/2023 Views: 725314
Port side bonded in place after tapping aluminium ring, and inserting cut down, scuff sanded and wet out with Redux 4-40 100 degree flat head screws. Screw heads and edge of aluminium ring packed with Redux/flox.