|
|
You can see the pillow block is aft of the threads
Date: 12/13/2013
Views: 7491
|
|
|
Igus bracket and spacers
Date: 11/27/2013
Views: 6838
|
|
|
|
Mill round slot in master cylinder 8 of 12
Date: 12/23/2013
Views: 7328
|
|
|
Rod end clevis fork ground down to 1.975" (again minimum 9.5 threads of engagement)
Date: 12/13/2013
Views: 8135
|
|
|
|
Mill round slot in master cylinder 10 of 12
Date: 12/23/2013
Views: 6826
|
|
|
Front threaded rod cut down to .450 (I aim for minimum of 9.5 threads of engagement on any 5/16-24 joint)
Date: 12/13/2013
Views: 7087
|
|
|
|
Oops, a few air bubles on aft mount reinforcemelay-up, drilled holes, filled with Aeropoxy, plugged with dry flox and Peel-Ply
Date: 11/30/2013
Views: 7925
|
|
|
Made spacer a few thousands shorter than the pillow block hole
Date: 11/29/2013
Views: 7263
|
|
|
|
Melted metal together (TIG), then Self Etch Primer
Date: 11/28/2013
Views: 6638
|
|
|
Eric Engineering increase in force needed when cable is deflected 1
Date: 12/03/2013
Views: 6627
|
|
|
|
You really can't see with the pillow block in place, but lightening holes under contact area
Date: 11/27/2013
Views: 8421
|
|
|
Clamps to be used Y13-12-15 1 of 2
Date: 12/16/2013
Views: 6296
|
|
|
|
Checking Flap Throw 2
Date: 12/13/2013
Views: 6280
|
|
|
Nut-plates
Date: 11/27/2013
Views: 9338
|
|
|
|
Mill round slot in master cylinder 2 of 2
Date: 12/24/2013
Views: 14422
|
|
|
Front HardPoint 7
Date: 12/27/2013
Views: 9407
|
|
|
|
Emergency Maneuver that starts with Heim? 4 of 13
Date: 12/16/2013
Views: 7845
|
|
|
Ready to install nut-plates
Date: 11/27/2013
Views: 8977
|
|
|
|
Half the weight was eliminated since I first cut steel
Date: 11/27/2013
Views: 7462
|
|
|
Overall view of front mount
Date: 12/13/2013
Views: 6792
|
|