|
|
Action of Aft Cable Mount mov. 1
Date: 12/13/2013
Views: 4900
|
|
|
Melted metal together (TIG), then Self Etch Primer
Date: 11/28/2013
Views: 7366
|
|
|
|
Front Cable Mount with Lever in Down Position
Date: 12/12/2013
Views: 7367
|
|
|
OK, we are ready for in situation fitting to get correct length and angle of 1" tube
Date: 11/27/2013
Views: 7335
|
|
|
|
Clamps to be used Y13-12-15 1 of 2
Date: 12/16/2013
Views: 7098
|
|
|
Front HardPoint 8
Date: 12/27/2013
Views: 10524
|
|
|
|
Emergency Maneuver that starts with Heim? 10 of 13
Date: 12/16/2013
Views: 8137
|
|
|
1/2" ball end-mill on order (McMaster) to to mill a pocket in the brake master cylinder directly above the mounting holes
Date: 12/13/2013
Views: 8777
|
|
|
|
Mill round slot in master cylinder 2 of 2
Date: 12/24/2013
Views: 15789
|
|
|
The shoulder of my spacers allows for a tiny bit more deflection than without
Date: 11/27/2013
Views: 7718
|
|
|
|
Front threaded rod cut down to .450 (I aim for minimum of 9.5 threads of engagement on any 5/16-24 joint)
Date: 12/13/2013
Views: 7877
|
|
|
Emergency Maneuver that starts with Heim? 9 of 13
Date: 12/16/2013
Views: 8294
|
|
|
|
Action of Aft Cable Mount mov. 2
Date: 12/13/2013
Views: 4588
|
|
|
Mill round slot in master cylinder 1 of 2
Date: 12/23/2013
Views: 7834
|
|
|
|
1/2" clamps that allow cable to slide 1 of 2
Date: 12/16/2013
Views: 9364
|
|
|
Front HardPoint 4
Date: 12/27/2013
Views: 10573
|
|
|
|
Length of coupler is ~ .855" cut down from 1". 9.5 times two is 19, so this allows minimum of 19 threads of engagement
Date: 12/13/2013
Views: 6794
|
|
|
Front HardPoint 6
Date: 12/27/2013
Views: 10738
|
|
|
|
Here's my extra deflection
Date: 11/27/2013
Views: 7088
|
|
|
Pretty much the front is flight ready.
Date: 12/16/2013
Views: 10534
|
|