|
|
Ready for final assembly
Date: 11/29/2013
Views: 7129
|
|
|
Reinforce gear tunnel front cable mount with aluminium
Date: 11/30/2013
Views: 6656
|
|
|
|
1 side painted with top coat
Date: 11/28/2013
Views: 7103
|
|
|
Ready to install nut-plates
Date: 11/27/2013
Views: 9683
|
|
|
|
A shot to show where the threads end
Date: 12/16/2013
Views: 7151
|
|
|
Cut down Heims to 1.700"
Date: 12/13/2013
Views: 6731
|
|
|
|
Emergency Maneuver that starts with Heim? 8 of 13
Date: 12/16/2013
Views: 6728
|
|
|
Checking Flap Throw 1
Date: 12/12/2013
Views: 7318
|
|
|
|
Cable Happy near Fuel Selector and below Air-Brake Cable 1
Date: 12/12/2013
Views: 8286
|
|
|
Front HardPoint 1
Date: 12/27/2013
Views: 9682
|
|
|
|
Threaded rod dimensions
Date: 12/16/2013
Views: 8108
|
|
|
Overall view of front mount
Date: 12/13/2013
Views: 7192
|
|
|
|
1/8" 4130 bracket
Date: 11/27/2013
Views: 7502
|
|
|
Aft mount
Date: 12/13/2013
Views: 6595
|
|
|
|
Reinforcement
Date: 11/27/2013
Views: 10044
|
|
|
What an idiot, I turned off half the nut down to spacer OD to save a little weight
Date: 12/13/2013
Views: 7025
|
|
|
|
Besides a little paint and Redux, Flight Ready
Date: 12/16/2013
Views: 12657
|
|
|
You can see I left a little space so the spacer can pinch the bearing when the nut is tightened
Date: 12/13/2013
Views: 7003
|
|
|
|
2011 and 4032 aluminium stock for spacers
Date: 11/28/2013
Views: 9070
|
|
|
Front HardPoint 2
Date: 12/27/2013
Views: 9608
|
|