|
|
1/2" ball end-mill on order (McMaster) to to mill a pocket in the brake master cylinder directly above the mounting holes
Date: 12/13/2013
Views: 8121
|
|
|
You can see I left a little space so the spacer can pinch the bearing when the nut is tightened
Date: 12/13/2013
Views: 6765
|
|
|
|
Rod end clevis fork ground down to 1.975" (again minimum 9.5 threads of engagement)
Date: 12/13/2013
Views: 8483
|
|
|
Ready to install nut-plates
Date: 11/27/2013
Views: 9263
|
|
|
|
Mill round slot in master cylinder 5 of 12
Date: 12/23/2013
Views: 8607
|
|
|
Temporary mount using 1 flat head 1/4-28
Date: 12/13/2013
Views: 7164
|
|
|
|
Front HardPoint 7
Date: 12/27/2013
Views: 9774
|
|
|
Mill round slot in master cylinder 2 of 12
Date: 12/23/2013
Views: 7645
|
|
|
|
Emergency Maneuver that starts with Heim? 12 of 13
Date: 12/16/2013
Views: 8561
|
|
|
Mill round slot in master cylinder 1 of 12
Date: 12/23/2013
Views: 7384
|
|
|
|
Front Cable Mount with Lever in Down Position
Date: 12/12/2013
Views: 6845
|
|
|
Series 6 cable specifications 1 of 2
Date: 11/28/2013
Views: 6666
|
|
|
|
Igus bearings
Date: 11/27/2013
Views: 12110
|
|
|
Front HardPoint 9
Date: 12/31/2013
Views: 9702
|
|
|
|
Mill round slot in master cylinder 3 of 12
Date: 12/23/2013
Views: 9189
|
|
|
A shot to show where the threads end
Date: 12/16/2013
Views: 6927
|
|
|
|
Front Cable Mount with Lever in Up Position
Date: 12/12/2013
Views: 7220
|
|
|
The threaded portion of my "thunk" fits nicely inside this spacer
Date: 12/13/2013
Views: 9606
|
|
|
|
OK, we are ready for in situation fitting to get correct length and angle of 1" tube
Date: 11/27/2013
Views: 6878
|
|
|
Front Cable Mount with Lever in Up Position
Date: 12/12/2013
Views: 7548
|
|