|
|
Nut-plates
Date: 11/27/2013
Views: 10737
|
|
|
Reinforcement
Date: 11/27/2013
Views: 10627
|
|
|
|
Besides a little paint and Redux, Flight Ready
Date: 12/16/2013
Views: 13304
|
|
|
1/4-28 jam nuts
Date: 11/27/2013
Views: 7715
|
|
|
|
1 side painted with top coat
Date: 11/28/2013
Views: 7548
|
|
|
Shot of 1/4" hardware spacers
Date: 11/29/2013
Views: 9520
|
|
|
|
Made spacer a few thousands shorter than the pillow block hole
Date: 11/29/2013
Views: 8193
|
|
|
3.2 oz. for aft bracket
Date: 11/29/2013
Views: 8001
|
|
|
|
Oops, fixed a dent I made with a C-Clamp when testing spar Adel clamp bracket, Q-Cel, 1 BID and Peel-Ply
Date: 11/30/2013
Views: 9042
|
|
|
Ready to install nut-plates
Date: 11/27/2013
Views: 10237
|
|
|
|
Ready for final assembly
Date: 11/29/2013
Views: 7515
|
|
|
New 1/4-28 nuts
Date: 11/29/2013
Views: 8311
|
|
|
|
Here's my extra deflection
Date: 11/27/2013
Views: 7287
|
|
|
Glass in reinforcement
Date: 11/27/2013
Views: 7444
|
|
|
|
Drill jig
Date: 11/27/2013
Views: 7622
|
|
|
3" wide x 1/8" thick 4130 Chrome Moly for bracket
Date: 11/28/2013
Views: 8480
|
|
|
|
Now you can see lightening holes onthe small offsetting plate
Date: 11/28/2013
Views: 8382
|
|
|
Oops, several dents being repaired in Port seat base, Q-Cel, 1 BID, Peel-Ply
Date: 11/30/2013
Views: 9643
|
|
|
|
Self Etching Primed
Date: 11/28/2013
Views: 7748
|
|
|
ESTM-20 Specification Sheet
Date: 11/28/2013
Views: 8327
|
|