Login
EuropaOwners Random Items Battery Switch operation.
Advanced Search
View Slideshow (Fullscreen)

Random Items

1. Flap fairing 1 ... 27. Bench twixt... 28. Flap fairing 2 29. SScableends 30. Battery... 31. FUELKSYSTEM... 32. SScableends 33. BED2 ... 47. wingdrawer2

Random Images

IMG_2859

IMG_2859

Date: 12/03/2008 Views: 5992

IM003683

IM003683

Date: 12/02/2007 Views: 8370

Port front tang gap cover shaped.

Port front tang gap cover shaped.

Date: 10/16/2009 Views: 5953

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 847912

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 847912

Battery Switch operation.

Battery Switch operation.
"Basically the controls are just by my left wrist in
the left seat, spring-loaded to go aft. Aft is OFF. The control knobs sit in
slots, and will spring aft if not in the Power-On slot (or if the cable
snaps, etc.) The cables snake aft to the Switch Board which holds the
switches in the ‘fuselage behind the second bulkhead – see above), The
switches take the battery(s) power and deliver to the firewall port side via
1/2inch copper pipe with CCA#4 cable. I hope that makes it a bit clearer –
sorry for all the Mbits."
Y10-02-14

Date: 02/22/2010
Full size: 465x640
nextlast
first previous
Battery Switch operation.
nextlast
first previous
Powered by Gallery v2.3