Login
EuropaOwners Recent Updates
Advanced Search

Random Images

25052002151420_G

25052002151420_G

Date: 12/31/1969 Views: 4766

Riga Latvia.EVRA

Riga Latvia.EVRA

Date: 06/07/2005 Views: 8236

IMG_1866

IMG_1866

Date: 08/11/2004 Views: 6285

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 765564

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 765564

Recent Updates

Date: 01/28/2026
Owner: Guest
Size: 400 items
first previous
IMG_1471ann

IMG_1471ann

2011 01 27 One final check of alignment before drilling.

Date: 01/27/2011
Views: 4776
IMG_0822ann

IMG_0822ann

Set to drilling and bolting the new outer brackets in place.

Date: 01/27/2011
Views: 5099
IMG_0823ann

IMG_0823ann

the other flap bracket.

Date: 01/27/2011
Views: 5123
IMG_0824ann

IMG_0824ann

Somewhere along the way, a couple spacers had been lost. Made up new ones. Also put anchor nuts on the radiator mounting flanges to make assembly easier, sorta, kinda. Seems like reassembling this aircraft is more difficult than the original building.

Date: 01/27/2011
Views: 5021
IMG_1426ann

IMG_1426ann

2010 12 21 - Taking advantage of a couple days of nice weather. Installed the cooling duct and heat exchangers.

Date: 12/21/2010
Views: 4870
IMG_1431ann

IMG_1431ann

Continuing work on the fill/sand

Date: 12/21/2010
Views: 5278
IMG_1593ann

IMG_1593ann

Installed the master cylinder and parking brake and began connecting brake lines.

Date: 03/16/2011
Views: 6023
IMG_1595ann

IMG_1595ann

Test fit of the intercooler.

Date: 03/16/2011
Views: 4733
IMG_1423ann

IMG_1423ann

Ran the left and right brake line up through the tunnel.

Date: 12/20/2010
Views: 5087
IMG_1418ann

IMG_1418ann

I had also been working on a stainless steel cover/mount which attaches to the lower firewall and will support the front edge of the monowheel hole cover.

Date: 12/20/2010
Views: 5061
IMG_1425em

IMG_1425em

Just kind of a status photo as of 2010 12 20

Date: 12/20/2010
Views: 5131
IMG_1412ann

IMG_1412ann

2010 12 20 It's difficult to work in the hanger during the cold of late November and all of December. I tended to stay home and work in the shop on the "Taz" the Little Toot Sport Biplane I'm building. On the occasional nice day like this I ma

Date: 12/20/2010
Views: 5696
IMG_0767ann

IMG_0767ann

2010 11 23 Began putting the baffle/supports back on.

Date: 11/23/2010
Views: 6683
IMG_0766ann

IMG_0766ann

Baffle/supports screwed down and safety wired.

Date: 11/23/2010
Views: 7220
IMG_0768ann

IMG_0768ann

Also bonded the parking brake mount in place.

Date: 11/23/2010
Views: 6715
IMG_1371ann

IMG_1371ann

2010 11 17 Had some leftover SuperFil from wing work so I cleaned up the holes in the tail where the old tailwheel cables exited the aft fuselage and proceeded to fill them.

Date: 11/17/2010
Views: 7038
IMG_1373ann

IMG_1373ann

For the last several days I had been making up a cover for the monowheel hole. Here it's ready for a test fit and any adjustments necessary.

Date: 11/17/2010
Views: 6840
IMG_1374ann

IMG_1374ann

I also received the new parts for the Rotax oil pressure regulator so I replaced them and safety wired it all back together.

Date: 11/17/2010
Views: 6923
IMG_1364ann

IMG_1364ann

2010 11 13 I began the fill/sand routine on the patched areas of the wing.

Date: 11/13/2010
Views: 6482
IMG_1362ann

IMG_1362ann

2010 11 12 Was a total waste of a day. After arriving at the hanger, I went in to open the hanger door. When the hanger door had been opened I was greeted by the sight of a drooping rear bumper on the Ranger. Went to the droopy side and found this. R

Date: 11/12/2010
Views: 15543
first previous
Page: 1 ... 14 15 16 17 18 19 20
Powered by Gallery v2.3