Login
EuropaOwners Recent Updates InstrumentPanel17Ann
Advanced Search
View Slideshow (Fullscreen)

Recent Updates

1. RudderMount... ... 111. InstrumentP... 112. InstrumentP... 113. InstrumentP... 114. InstrumentP... 115. InstrumentP... 116. InstrumentP... 117. InstrumentP... ... 249. OutriggerMod15

Random Images

Front fuse conduit run 34.

Front fuse conduit run 34.

Date: 12/07/2010 Views: 5108

Tie-bar 46.

Tie-bar 46.

Date: 11/17/2010 Views: 5287

Door hinge rebates 43.

Door hinge rebates 43.

Date: 11/10/2009 Views: 4505

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693399

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693399

InstrumentPanel17Ann

The busses (MB-1, +12v & Ground) were positioned and the two flexi-buss strip were fastened in place with anchor nuts and screws. The MB-1 strip requires that screws and nuts be purchased to affix it. The +12v and Ground firewall through-bolts were installed and connected to their respective busses. The wiring from the aft of the fuselage were fitted and attached to the appropriate terminals. Two Clic-Bond cable tie bases were bonded in place.

Date: 05/25/2004
Full size: 640x480
nextlast
first previous
InstrumentPanel17Ann

Photo Properties

summary  details
Make NIKON Model E775
Aperture Value f/2.8 Color Space Uncalibrated
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash Focal Length 5.8 mm
ISO 100 Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Tue 25 May 2004 10:00:34 PM UTC
IPTC: Caption
nextlast
first previous
Powered by Gallery v2.3