Date: 08/09/2007 Views: 5107
Date: 03/05/2004 Views: 4019
Date: 09/18/2010 Views: 5920
Date: 08/23/2023 Views: 705408
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.