Date: 09/21/2008 Views: 6214
Date: 09/15/2009 Views: 9249
Date: 12/12/2008 Views: 7785
Date: 08/23/2023 Views: 791479
The stainless steel tubing for the mod was cut. The outrigger fittings were drilled to accept the tubing. Tubing scuff sanded and inserted.