Date: 06/19/2009 Views: 4292
Date: 03/02/2009 Views: 5606
Date: 06/03/2007 Views: 7546
Date: 08/23/2023 Views: 722111
The area where the tie bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.