Second and final pass of Port top wingskin bond on 3.
Date: 09/13/2010
Views: 7244
Newest Image
EAA SITE
Date: 08/23/2023
Views: 797901
Most Viewed Image
EAA SITE
Date: 08/23/2023
Views: 797901
HeadlinerWiring09Ann
Rummaged through the parts bin and came up with some nuts that fit. Not shown, filled the surface weave with superfil. Let it set overnight and sand tomorrow. Should have the new rocker switches on Monday.