Date: 08/02/2003 Views: 7473
Date: 04/23/2008 Views: 5132
Date: 10/25/2009 Views: 7156
Date: 08/23/2023 Views: 766641
The narrow washer or spacer was bonded down with J-B Weld and allowed to cure for two days. The brake was put back on the landing gear and the banjo hose end fastened down.