Battery Switch operation. 
Battery Switch operation.  
"Basically the controls are just by my left wrist in 
the left seat, spring-loaded to go aft. Aft is OFF. The control knobs sit in 
slots, and will spring aft if not in the Power-On slot (or if the cable 
snaps, etc.) The cables snake aft to the Switch Board which holds the 
switches in the ‘fuselage behind the second bulkhead – see above), The 
switches take the battery(s) power and deliver to the firewall port side via 
1/2inch copper pipe with CCA#4 cable. I hope that makes it a bit clearer – 
sorry for all the Mbits." 
Y10-02-14
 
 | 
 
Full size: 
465x640
 
 
 |