Date: 11/12/2009 Views: 4818
Date: 08/19/2012 Views: 68107
Date: 10/11/2009 Views: 5073
Date: 08/23/2023 Views: 765652
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09