Date: 12/31/1969 Views: 4077
Date: 06/22/2009 Views: 4974
Date: 10/05/2010 Views: 6734
Date: 08/23/2023 Views: 723135
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09