Date: 12/31/1999 Views: 4836
Date: 05/29/2005 Views: 4106
Date: 09/02/2004 Views: 4412
Date: 08/23/2023 Views: 144722
Date: 05/23/2007 Views: 549843
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.