Date: 12/31/1969 Views: 4222
Date: 07/29/2007 Views: 3776
Date: 04/16/2008 Views: 7398
Date: 08/23/2023 Views: 721463
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.