Date: 10/30/2007 Views: 6729
Date: 09/14/2009 Views: 5647
Date: 09/04/2010 Views: 6586
Date: 08/23/2023 Views: 768986
I cleaned up the inside and outside of the tie-bar, cut to proper length and sanded the ends so the sockets now fit. Alan did a first pass 36 grit sanding of the tunnel. Y10-11-09