Date: 12/31/1969 Views: 4261
Date: 01/01/2011 Views: 8623
Date: 02/14/2009 Views: 14826
Date: 08/23/2023 Views: 768931
WingSet96Ann The area where the tie-bar passes through a depression in the tunnel has to be prepared for closure. The tunnel depression with the areas of fiberglass and foam core removed in preparation for closure.