Login
EuropaOwners Random Items Tie-bar 77.
Advanced Search
View Slideshow (Fullscreen)

Random Items

1. Tie-bar 41. ... 41. Tie-bar 70. 42. Tie-bar 32. 43. Tie-bar 57. 44. Tie-bar 77. 45. Tie-bar 44. 46. Tie-bar 24. 47. Bob's... ... 83. Tie-bar 74.

Random Images

IMG_5625Ann

IMG_5625Ann

Date: 09/23/2007 Views: 5931

04Rudder_vacuum

04Rudder_vacuum

Date: 12/31/1969 Views: 5722

G_IVER_in_flight

G_IVER_in_flight

Date: 06/28/2009 Views: 5141

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 721941

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 721941

Tie-bar 77.

Foam and Q-cel trimmed and sanded, ready for final 2 BID layup.
Getting to this point included:
**First scuff sanding the tiebar with 80 grit and laying 1 BID with Redux and peel ply on the tie-bar
**Removing the top layer of glass and foam in the central tunnel
**Q-cel and foam laid up in the central tunnel rebate using installed tie-bar to insure close to what is needed placement
**Cleaning up foam and Q-cel in rebate and laying up 2 BID into central tunnel rebate
**Cleaning up above 2 BID layup
**Digging out foam on the sides of the central tunnel and filling with Flox and laying up 2 BID with peel ply
**Cleaning up above 2 BID layup
**Redux / Floxing in place tie-bar, using custom Peel ply dams for ends and filling top gaps and peel plying
**Cleaning up Redux / Flox from above step
**After wetting out and Floxing, 2 BID over tie-bar with Aeropoxy / 30 minute, when it tacked up Q-celled in place two plies of foam
**Cleaned up above layup and foam
**Then the final 2 BID layup with peel ply.
Y10-12-01

Date: 11/29/2010
Size:
Full size: 1900x1425
nextlast
first previous
Tie-bar 77.

Photo Properties

summary  details
Make NIKON Model E5900
Aperture Value f/4.8 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash Flash, Auto-Mode Focal Length 7.8 mm
ISO AUTO Metering Mode Multi-Segment
Shutter Speed Value 0.02 sec Date/Time Mon 29 Nov 2010 07:00:31 PM UTC
nextlast
first previous
Powered by Gallery v2.3