Login
EuropaOwners Most Viewed Items Vertical upright, swing-arm and generator install 7 of 7.
Advanced Search
View Slideshow (Fullscreen)

Most Viewed Items

1. DSCF0675 ... 66. Outside... 67. Bucket... 68. Vertical... 69. Vertical... 70. DSCF0625 71. DSCF0647 72. DSCF0684 ... 84. DSCF0622

Random Images

IMG_6341post

IMG_6341post

Date: 08/09/2009 Views: 5373

SurfaceFinish02

SurfaceFinish02

Date: 05/16/2003 Views: 5904

IMG_6536Ann

IMG_6536Ann

Date: 01/11/2008 Views: 5445

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693927

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693927

Vertical upright, swing-arm and generator install 7 of 7.

After testing various spindle diameters and surface roughness I settled on a 5/8" diameter with a light knurled finish. With the spindle still spinning in the lathe I took off the sharp edges of the knurl with 220 grit wet and dry sandpaper.
As I mentioned earlier it is imperative that the motor shaft is not exposed to any side loading or trauma greater than you can apply with your fingers.
Thus I drilled the bore hole slightly undersized, then ran a 5/16"reamer through to get a nice round and perfectly sized hole. This gives a great fit but requires tapping the spindle into place which is unacceptable. To prevent this required and undesirable tapping, I over-sized the hole a few thousands by running a 5/16 drill through several times.
After this last operation the spindle can be installed with your fingers only.

Y11-09-17

Date: 08/06/2003
Size:
Full size: 3040x4048
nextlast
first previous
Vertical upright, swing-arm and generator install 7 of 7.

Photo Properties

summary  details
Make FUJIFILM Model FinePix S7000
Aperture Value f/2.9 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash No Flash Focal Length 12 mm
ISO 200 Metering Mode Multi-Segment
Shutter Speed Value 1/60 sec Date/Time Wed 06 Aug 2003 01:35:35 PM UTC
nextlast
first previous
Powered by Gallery v2.3