Login
EuropaOwners Recent Updates Vertical upright, swing-arm and generator install 7 of 7.
Advanced Search
View Slideshow (Fullscreen)

Recent Updates

1. Required... ... 62. Port Bucket... 63. Axle caps 2... 64. DSCF0772 65. Vertical... 66. Female... 67. Option C)... 68. Option A)... ... 222. General...

Random Images

IMG_3072

IMG_3072

Date: 01/01/2011 Views: 6860

IMG_6139

IMG_6139

Date: 05/13/2013 Views: 5337

Label panel 2

Label panel 2

Date: 06/12/2010 Views: 2846

Newest Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693912

Most Viewed Image

EAA SITE

EAA SITE

Date: 08/23/2023 Views: 693912

Vertical upright, swing-arm and generator install 7 of 7.

After testing various spindle diameters and surface roughness I settled on a 5/8" diameter with a light knurled finish. With the spindle still spinning in the lathe I took off the sharp edges of the knurl with 220 grit wet and dry sandpaper.
As I mentioned earlier it is imperative that the motor shaft is not exposed to any side loading or trauma greater than you can apply with your fingers.
Thus I drilled the bore hole slightly undersized, then ran a 5/16"reamer through to get a nice round and perfectly sized hole. This gives a great fit but requires tapping the spindle into place which is unacceptable. To prevent this required and undesirable tapping, I over-sized the hole a few thousands by running a 5/16 drill through several times.
After this last operation the spindle can be installed with your fingers only.

Y11-09-17

Date: 08/06/2003
Size:
Full size: 3040x4048
nextlast
first previous
Vertical upright, swing-arm and generator install 7 of 7.

Photo Properties

summary  details
Make FUJIFILM Model FinePix S7000
Aperture Value f/2.9 Color Space sRGB
Exposure Bias Value 0 EV Exposure Program Program
Flash No Flash Focal Length 12 mm
ISO 200 Metering Mode Multi-Segment
Shutter Speed Value 1/60 sec Date/Time Wed 06 Aug 2003 01:35:35 PM UTC
nextlast
first previous
Powered by Gallery v2.3