Date: 09/07/2010 Views: 2417
Date: 07/22/2010 Views: 3666
Date: 09/19/2010 Views: 3349
Date: 08/23/2023 Views: 87784
While clamped, three holes were drilled for retainer hardware. One hole in the landing gear handle recess and two holes in the panel lower flange on the starboard side. The upper flange was marked for trim while the panel was clamped.