Tank cleaning, through vent and sender with borescope.
Date: 06/28/2010
Views: 6119
Tallin EETN Estonia
Date: 06/07/2005
Views: 3703
Newest Image
EAA SITE
Date: 08/23/2023
Views: 132912
WingSet89Ann
Spent the morning running errands. Afternoon on the Eruopa.
Working like a contortionist, I was able to drill the holes through the gusset plates and gussets. Inserted a bolt in each hole to hold things in place while the remaining holes were drilled. Believe it or not, almost three hours to drill the six holes.
Port side fixtures with the holes drilled and the bolts in place.