|
|
DSCN6130
Date: 10/11/2009
Views: 6613
|
|
|
StbdWingInspectHole01
Date: 10/17/2003
Views: 5932
|
|
|
|
010323_003
Date: 12/31/1969
Views: 4861
|
|
|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 193390
|
|
|
|
FuelSystemMod36Ann
Date: 04/23/2004
Views: 3313
|
|
|
IMG_0940Ann
Date: 07/29/2007
Views: 5673
|
|
|
|
Port rudder cable guide 4
Date: 05/31/2009
Views: 6867
|
|
|
Control_Systems_47
Date: 01/23/2006
Views: 4200
|
|
|
|
IMG_5906Ann
Date: 11/06/2007
Views: 5449
|
|
|
03_G
Date: 06/19/2009
Views: 4450
|
|
|
|
Mod70_10Ann
Date: 07/20/2005
Views: 3863
|
|
|
Nose fair 6/
Date: 04/10/2009
Views: 7572
|
|
|
|
DoorLatch28Ann
Date: 05/07/2004
Views: 3400
|
|
|
DSCF0018
Date: 07/02/2009
Views: 5878
|
|
|
|
Making awful fit of lift pads correct 15.
Date: 10/12/2010
Views: 6365
|
|
|
IMG_6685ann
Date: 10/02/2009
Views: 6163
|
|
|
|
IMG_2713
Date: 09/12/2010
Views: 6885
|
|
|
DSCN6557
Date: 10/25/2009
Views: 4297
|
|
|
|
img0485copy
Date: 07/29/2007
Views: 3510
|
|
|
DSCN6021Ann
Date: 05/06/2007
Views: 4245
|
|