|
|
IMG_6426post
Date: 08/09/2009
Views: 7257
|
|
|
IMG_1602
Date: 04/13/2010
Views: 8419
|
|
|
|
Airbrake viabration Bud.
Date: 09/02/2010
Views: 4239
|
|
|
Door mechanism cover install 4.
Date: 11/10/2010
Views: 13166
|
|
|
|
IMG00014-20100808-1913
Date: 08/08/2010
Views: 7741
|
|
|
KZ_rally_2009_001
Date: 09/20/2009
Views: 3657
|
|
|
|
StbdWingPins00
Date: 02/19/2004
Views: 4065
|
|
|
109_0910_IMG
Date: 01/05/2004
Views: 7974
|
|
|
|
66_throttle_lever
Date: 12/31/1969
Views: 5255
|
|
|
IM003418
Date: 10/31/2007
Views: 10792
|
|
|
|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 193417
|
|
|
P1010317
Date: 12/31/1969
Views: 5292
|
|
|
|
021002_Navlite2
Date: 12/31/1969
Views: 4728
|
|
|
Door hinge rebates 9.
Date: 11/03/2009
Views: 7676
|
|
|
|
DSCN5492Ann
Date: 01/26/2007
Views: 6199
|
|
|
DoorSupportMod52Ann
Date: 03/26/2006
Views: 3917
|
|
|
|
Aft sill cover 6.
Date: 08/29/2010
Views: 8679
|
|
|
IMG_6431post
Date: 08/09/2009
Views: 7846
|
|
|
|
CH18_24
Date: 12/31/1969
Views: 4365
|
|
|
IMG_2128
Date: 12/15/2004
Views: 7317
|
|