|
Fuel_System_22
Date: 09/16/2007
Views: 4380
|
|
|
DSCN6574
Date: 10/25/2009
Views: 3957
|
|
|
Second and final pass view from the inside 2.
Date: 09/13/2010
Views: 4308
|
|
|
DSCN3226
Date: 12/31/1969
Views: 3896
|
|
|
IM003434
Date: 10/31/2007
Views: 6307
|
|
|
Down_Elevator_Stop
Date: 09/02/2004
Views: 5194
|
|
|
DSC_0288
Date: 05/15/2008
Views: 4707
|
|
|
dsc09046
Making a layup schedule for rib 1.
Date: 01/23/2013
Views: 18703
|
|
|
DSCN5763Ann
Date: 04/20/2007
Views: 4508
|
|
|
Panel_17
Date: 01/23/2006
Views: 3997
|
|
|
Mod_70_09
Date: 04/15/2006
Views: 6586
|
|
|
Wheel dolly with lever lift 1.
Date: 06/21/2011
Views: 5473
|
|
|
Tie-bar 68.
Date: 11/21/2010
Views: 5237
|
|
|
39_G
Date: 06/19/2009
Views: 4184
|
|
|
LowerFuselageAccessPlates01
Date: 09/21/2003
Views: 4333
|
|
|
Strobererer_8
Date: 05/18/2009
Views: 4532
|
|
|
New MC-4A 07
Now we need mounting brackets. 1 1/4x1 1/4x1/8 aluminum angle has been cut to length (5 1/4 in) and is positioned on the brake mount for drilling the mounting holes using a wood block and clamp.
Date: 04/14/2012
Views: 4144
|
|
|
BrakeCylMount3
Date: 06/30/2003
Views: 5617
|
|
|
Port aft spacer perfectly bonded.
Date: 10/14/2009
Views: 4202
|
|
|
DSCF0098
Date: 06/22/2009
Views: 6107
|
|