|
DSCN6094Ann
Date: 06/12/2007
Views: 3513
|
|
|
13062003173148_G
Date: 12/31/1969
Views: 2226
|
|
|
ra_g_ptag
Date: 12/31/1969
Views: 3564
|
|
|
DSCN6343
Date: 10/11/2009
Views: 2464
|
|
|
Switch protector
Switch protector could allow 2 positions of a 3 position switch to operate.
Date: 04/14/2007
Views: 2730
|
|
|
IMG_0129post
Date: 09/03/2010
Views: 2794
|
|
|
imm028_29
Date: 09/02/2009
Views: 3434
|
|
|
Harrison_Tailplane_Bracket_Mod_23
Date: 05/19/2008
Views: 3313
|
|
|
DSCN6041
Date: 10/11/2009
Views: 4631
|
|
|
img0283copy
Date: 07/29/2007
Views: 2328
|
|
|
Nose complete 4. Y10-01-07
Date: 01/06/2010
Views: 5901
|
|
|
Ultimate ventilator installation and associated repair 8.
Date: 07/10/2009
Views: 3326
|
|
|
DSCF0085
Date: 02/14/2009
Views: 2994
|
|
|
Air-brake cables were used to determine feasibility and length needed
Date: 11/27/2013
Views: 4347
|
|
|
Rotax setup for certified 914s.
Date: 03/06/2007
Views: 6240
|
|
|
DSCN6029Ann
Date: 05/06/2007
Views: 2593
|
|
|
Steel for front mount
Date: 11/27/2013
Views: 4909
|
|
|
DSCF0044
Date: 03/02/2009
Views: 2865
|
|
|
IMG_8165Ann
Date: 07/14/2008
Views: 2679
|
|
|
IMG_6977
The white stuff you see is low-expansion foam that was squirted in to provide support so this wouldn't happen. Unfortunately, I could not get foam under the port side sufficiently to support that side. That's where the crack developed.
Date: 10/19/2013
Views: 4461
|
|