|
|
Tie-bar 18.
Date: 11/14/2010
Views: 6698
|
|
|
DSCN2728
Erich Trombley on left, Kevin Klinefelder center, Kim Prout on right
Date: 09/18/2010
Views: 8013
|
|
|
|
IMG_0178
Date: 04/14/2005
Views: 4440
|
|
|
IMG_2683
Here are the new MATCO master cylinders connected to the old levers sitting on the old base. Now how do we contain the back ends to make this work?
Date: 04/07/2012
Views: 4873
|
|
|
|
Port front spacer complete and held in place with double sticky tape.
Date: 10/12/2009
Views: 5203
|
|
|
041302_leveling3
Date: 12/31/1969
Views: 3490
|
|
|
|
Front fuse conduit run 13.
Date: 09/08/2010
Views: 7316
|
|
|
IM001314
Date: 10/30/2007
Views: 7752
|
|
|
|
DSCN6101
Date: 10/11/2009
Views: 5334
|
|
|
AftAccessPanels02
Date: 01/30/2004
Views: 4173
|
|
|
|
3 Mixing sticks are a tad over 3/16".
Date: 01/25/2010
Views: 6071
|
|
|
DSCF0037
Date: 10/24/2010
Views: 6769
|
|
|
|
Starboard_antiservo_clearance_Y9_06_07
Date: 06/07/2009
Views: 5096
|
|
|
Switch protector
Switch protector could allow 2 positions of a 3 position switch to operate.
Date: 04/14/2007
Views: 5893
|
|
|
|
Template Y7-10-30
Date: 10/30/2007
Views: 5725
|
|
|
Self_Engage_Flap_Drive_Tube
Date: 12/31/1969
Views: 7636
|
|
|
|
MG_2982
Date: 03/17/2008
Views: 4606
|
|
|
DSC_0237
Date: 05/15/2008
Views: 4895
|
|
|
|
109_0934_IMG
Date: 01/10/2004
Views: 5666
|
|
|
Taking_off_runway_05_Venice_Lido_LIPV
Date: 08/24/2009
Views: 5757
|
|