|
Tie-bar 20.
Date: 11/14/2010
Views: 5754
|
|
|
Flowscan wire run 4.
Date: 08/04/2010
Views: 4743
|
|
|
11_vacuum_bagginf_TP
Date: 12/31/1969
Views: 4081
|
|
|
DSCN6618
Date: 10/25/2009
Views: 3943
|
|
|
022202_fitting_lense
Date: 12/31/1969
Views: 4143
|
|
|
Untitled_2
Date: 12/31/1969
Views: 5700
|
|
|
IMG_0135Ann
Date: 12/19/2008
Views: 4026
|
|
|
DSCN6142Ann
Date: 06/17/2007
Views: 6404
|
|
|
P1010041
Date: 11/29/1999
Views: 6246
|
|
|
IM003492
Date: 10/31/2007
Views: 6770
|
|
|
IMG_2559
Add the 2 meter extension to the 1 meter length and run the viewer down to the brake area.
Date: 03/12/2012
Views: 5486
|
|
|
Rotax 914 with cooling air baffle.
Date: 11/04/2004
Views: 5088
|
|
|
DSCF0024
Date: 01/09/2010
Views: 5695
|
|
|
Aft fuse conduit run 14.
Date: 08/20/2010
Views: 5004
|
|
|
DSCN5756Ann
Date: 04/20/2007
Views: 4534
|
|
|
IMG_0408Ann
Date: 08/09/2008
Views: 4409
|
|
|
IMG_2169
Date: 01/02/2005
Views: 4227
|
|
|
IMG_1280ann
Poly has been taped over the front half. This will prevent the interior layup from sticking to the front half forming the joining flange. The front and rear have been taped together in preparation for the inner layup.
Date: 03/29/2011
Views: 4215
|
|
|
24_04_08_vliegfoto_s_107
Date: 04/26/2008
Views: 3885
|
|
|
DSCN5957Ann
Date: 05/01/2007
Views: 3897
|
|