|
|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 171885
|
|
|
Drawer closer 6.
Date: 08/17/2010
Views: 7441
|
|
|
|
IMG_6984
But there's no way to get it in. It is too wide to go between the door sills.
Date: 10/21/2013
Views: 8996
|
|
|
DSCN5947Ann
Date: 04/26/2007
Views: 5303
|
|
|
|
Pre-made harness 2.
Date: 03/26/2009
Views: 6080
|
|
|
IMG_7530ann
First try was just to bolt the BSPP banjo onto the brake. Needless to say, that was just too simple to work. It wouldn't seat properly in the BSPT brake.
Date: 04/18/2010
Views: 4671
|
|
|
|
IMG_8088Ann
Date: 07/08/2008
Views: 5538
|
|
|
IMG_0092
Date: 07/01/2005
Views: 4970
|
|
|
|
Port instrument insert 7.
Date: 04/23/2009
Views: 6650
|
|
|
InstrumentPanel73Ann
Date: 10/09/2004
Views: 4281
|
|
|
|
DSC00870
Date: 04/15/2005
Views: 5050
|
|
|
10_G
Date: 06/19/2009
Views: 4200
|
|
|
|
Cruse04
Date: 12/31/1969
Views: 4220
|
|
|
Birr 2015
EI-BR 20/4/2015
Date: 04/20/2015
Views: 6733
|
|
|
|
IMG_2446_001
Date: 12/23/2005
Views: 8244
|
|
|
fuelremotetop_Small
Date: 12/03/2006
Views: 4955
|
|
|
|
BaggageBay08Ann
Date: 10/23/2005
Views: 3518
|
|
|
IMG_6142post
Date: 08/09/2009
Views: 5475
|
|
|
|
Fin cap 5.
Date: 03/20/2009
Views: 13367
|
|
|
063002_ruddercables
Date: 12/31/1969
Views: 3551
|
|