|
Fin rib complete 2.
Date: 05/05/2009
Views: 4978
|
|
|
WingSet00
Date: 07/11/2004
Views: 4099
|
|
|
SA 2012 02 P52
Sport Aviation, February 2012, page 52, "When to Overhaul" by Mike Busch/Commentary/SAVVY AVIATION.
Date: 02/22/2012
Views: 5528
|
|
|
dscn0729
Date: 12/31/1969
Views: 3410
|
|
|
Bucket clamp 1 of 3.
Date: 08/06/2003
Views: 7391
|
|
|
Autopilot_26
Date: 05/19/2008
Views: 4377
|
|
|
GJ7I2381
Date: 07/09/2006
Views: 3997
|
|
|
IM003523
Date: 11/04/2007
Views: 6106
|
|
|
DSCF0056
Date: 08/18/2009
Views: 5289
|
|
|
IMG_6796
Date: 02/22/2008
Views: 4417
|
|
|
zarate brazo largo
Date: 03/04/2016
Views: 6846
|
|
|
IMG_0170post
Date: 09/06/2010
Views: 4238
|
|
|
DSC00155
As you can see the Issue 1 Bearings are considerably longer and will require shortening once I have the correct dimensions.
Date: 09/03/2015
Views: 28967
|
|
|
Battery Box Attachment_7
Date: 04/11/2010
Views: 4174
|
|
|
IMG_0116
Date: 07/02/2005
Views: 4423
|
|
|
29122008241_G
Date: 10/27/2009
Views: 6279
|
|
|
IM002675
Date: 10/30/2007
Views: 5495
|
|
|
New MC-4A 12
The whole assembly should now fit, length and width, within the existing space. So the unit may be dropped down as needed to allow for it being taller. Due to outside commitments, it looks like it will be Wednesday (18th) before I can get to the hanger
Date: 04/15/2012
Views: 4701
|
|
|
DSCN5269Ann
Date: 12/19/2006
Views: 4445
|
|
|
CH8_13
Date: 12/31/1969
Views: 5943
|
|