|
|
DSCF0056
Date: 08/18/2009
Views: 6113
|
|
|
109_0918_IMG
Date: 01/06/2004
Views: 6507
|
|
|
|
dscn1056
Date: 12/31/1969
Views: 3722
|
|
|
WingSet39Ann
Date: 07/22/2004
Views: 3727
|
|
|
|
Schottky diode added 1 of 6.
Date: 08/12/2003
Views: 8571
|
|
|
IM003033
Date: 10/29/2007
Views: 9421
|
|
|
|
IMG_2195Ann
Date: 09/19/2008
Views: 5065
|
|
|
DSCN6236
Date: 10/11/2009
Views: 6906
|
|
|
|
IMGA0300
Date: 06/10/2015
Views: 29097
|
|
|
Tail_Wheel_Install_6
Date: 02/04/2009
Views: 4629
|
|
|
|
Option B) Electrical Box install 5 of 5.
Date: 08/12/2003
Views: 9939
|
|
|
Panel population 2.
Date: 03/01/2010
Views: 6758
|
|
|
|
WingSet47
Date: 07/23/2004
Views: 3580
|
|
|
DSCF0023
Date: 07/24/2010
Views: 10899
|
|
|
|
912 ULS oil leak 4
Date: 03/11/2011
Views: 4769
|
|
|
MG_1674
Date: 07/09/2006
Views: 5113
|
|
|
|
22112003200347_G
Date: 12/31/1969
Views: 4386
|
|
|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 193362
|
|
|
|
Planning panel 1.
Date: 10/29/2007
Views: 15586
|
|
|
U1
Date: 10/26/2008
Views: 6867
|
|