|
|
DSCN6039Ann
Date: 06/07/2007
Views: 6097
|
|
|
Bonding Port lift pin sockets 2.
Date: 10/28/2010
Views: 5272
|
|
|
|
IMG_7230
It was determined that a 1/4 in (6.4 mm) thick piece of rigid urethane foam topped with cork was needed to support the front "ledge" of the tank so it wouldn't sag.
Date: 01/26/2014
Views: 9238
|
|
|
img0192copy
Date: 07/29/2007
Views: 5199
|
|
|
|
Sternpost bonding 4.
Date: 05/07/2009
Views: 6271
|
|
|
IMG_1924
Date: 10/17/2004
Views: 5813
|
|
|
|
Port bottom strengthening.
Date: 01/20/2010
Views: 7079
|
|
|
Tie-bar 32.
Date: 11/17/2010
Views: 5255
|
|
|
|
DSC00073_001
Date: 12/31/1969
Views: 5373
|
|
|
IMG_2920Ann
Date: 01/02/2009
Views: 5503
|
|
|
|
DSCN4639Ann
Date: 08/13/2006
Views: 5706
|
|
|
Control_Systems_65_25
Date: 06/03/2007
Views: 4200
|
|
|
|
IMG_3389
Date: 10/24/2010
Views: 7558
|
|
|
Port spar pin washer retention 3.
Date: 11/09/2010
Views: 26962
|
|
|
|
dscn0369
Date: 12/31/1969
Views: 5807
|
|
|
RudderPedal11
Date: 02/12/2004
Views: 4549
|
|
|
|
IMG_5626Ann
Date: 09/23/2007
Views: 4362
|
|
|
MG_2934
Date: 03/17/2008
Views: 4289
|
|
|
|
083102_filingwindow2
Date: 12/31/1969
Views: 3802
|
|
|
Cam clamp layup 1.
Date: 03/29/2009
Views: 6878
|
|