|
Fuselage_16
Date: 06/09/2007
Views: 2928
|
|
|
DSCF0024
Date: 07/27/2010
Views: 3426
|
|
|
IM000437
Date: 10/28/2007
Views: 5168
|
|
|
01052003204346_G
Date: 12/31/1969
Views: 2581
|
|
|
img0203copy
Date: 07/29/2007
Views: 3348
|
|
|
DSC02627
Date: 05/15/2010
Views: 3554
|
|
|
After layup was complete, peel plied.
Date: 08/31/2009
Views: 3084
|
|
|
Revised schematic adressing prop 3.
Date: 06/08/2010
Views: 3142
|
|
|
IMG_0912post
After much flailing about which shall not be documented here, I went back to the double puck brake and spent a couple days trying to bleed the new system. Without much luck. I called Robby at Grove Aircraft and he pointed out that if there were any high
Date: 07/01/2010
Views: 3104
|
|
|
IM003218
Date: 10/30/2007
Views: 3727
|
|
|
IMG_6969
The top of the back rest removed. The rotary tool could not get into the area on the sides. A hacksaw blade was recruited for that effort. And it was an effort!
Date: 10/18/2013
Views: 4889
|
|
|
INSTALLIATION MANUAL ROTAX 914
Date: 08/08/2010
Views: 2192
|
|
|
30062003144743_G
Date: 12/31/1969
Views: 2381
|
|
|
dscn1780
Date: 12/31/1969
Views: 2481
|
|
|
25092002172742_G
Date: 12/31/1969
Views: 2277
|
|
|
109_0980_IMG
Date: 01/30/2004
Views: 3412
|
|
|
Flugzeugabsturz_22_08_2008_Marchtrenk_002
Date: 08/22/2008
Views: 3327
|
|
|
DSCN5266
Date: 06/24/2009
Views: 2882
|
|
|
Taking_off_from_Almera_39C_temp
Date: 07/03/2009
Views: 3096
|
|
|
latchwithauto
Date: 08/14/2011
Views: 1828
|
|