|
|
Single point ground 4.
Date: 04/18/2009
Views: 7555
|
|
|
DSC00078
Date: 12/31/1969
Views: 6364
|
|
|
|
IMG_2484Ann
Date: 11/16/2008
Views: 4785
|
|
|
Front HardPoint 4
Date: 12/27/2013
Views: 10123
|
|
|
|
IMG_0009Ann
Date: 07/09/2007
Views: 4799
|
|
|
DSCN9936
Date: 12/31/1969
Views: 6910
|
|
|
|
IMG_0045post
Put a bit of fluid in the reservoir and observe bubbles. Air is being pushed out and replaced by fluid. That's good. Watched this for almost an hour till the bubbles stopped and the reservoir began to fill. Shut the bleed contraption, stuff the line b
Date: 07/08/2010
Views: 6012
|
|
|
Port front tang rebate, going to use thin G-10 to cover gap.
Date: 10/16/2009
Views: 5256
|
|
|
|
Cork_Ireland
Date: 05/08/2003
Views: 5650
|
|
|
dsc09048
Template for the Stbd side. Note, you are not required per the manual to hook over the plywood with bid.
Date: 01/24/2013
Views: 19283
|
|
|
|
DSCN5612Ann
Date: 03/11/2007
Views: 4461
|
|
|
IMG_0186
Date: 04/14/2005
Views: 4096
|
|
|
|
DSCN4712Ann
Date: 09/03/2006
Views: 5716
|
|
|
DSCF0093
Date: 10/27/2009
Views: 9331
|
|
|
|
IMG_0056
Date: 03/03/2007
Views: 8120
|
|
|
Starboard wing complete 1.
Date: 09/15/2009
Views: 5351
|
|
|
|
DSCN6041Ann
Date: 06/07/2007
Views: 4141
|
|
|
Option C) Electrical Box install 1 of 3.
Date: 08/12/2003
Views: 10077
|
|
|
|
Front Starboard fuse stiffening for lift socket 9.
Date: 10/24/2010
Views: 5768
|
|
|
first_landing_1
Date: 07/19/2007
Views: 4246
|
|