|
|
Fin plumbing 3.
Date: 04/13/2009
Views: 7279
|
|
|
Bb4
Date: 02/01/2009
Views: 5655
|
|
|
|
Completion of Port top skin bond on 63.
Date: 09/22/2010
Views: 5067
|
|
|
Wheel dolly with lever lift 2.
Date: 06/21/2011
Views: 6881
|
|
|
|
DSC_0185
Date: 09/21/2007
Views: 5962
|
|
|
Kingsley 7.
Date: 08/27/2005
Views: 6691
|
|
|
|
dsc08661
Locating the center of the main gear hole. Used a pilot to be used to measure out the 10“ diameter on the bottom.
Date: 04/22/2012
Views: 24458
|
|
|
DSCN5711Ann
Date: 04/06/2007
Views: 4918
|
|
|
|
DSC00874
Date: 04/15/2005
Views: 5528
|
|
|
late afternoon flight
Date: 03/03/2016
Views: 6557
|
|
|
|
IMG_2025
Date: 08/18/2009
Views: 5951
|
|
|
FL 18 hollow pivot 2
Date: 08/04/2013
Views: 8608
|
|
|
|
Outside looking into my den 2.
Date: 07/24/2003
Views: 8635
|
|
|
TailplaneTube06
Date: 12/20/2003
Views: 5332
|
|
|
|
Sanding out port bottom spar ripple.
Date: 10/05/2009
Views: 4931
|
|
|
Graham 1 aerofoil47in
Date: 09/10/2010
Views: 3049
|
|
|
|
IMG_0328post
Date: 09/18/2010
Views: 8395
|
|
|
QE2_bridge_toll_booths_on_M25_Motorway
Date: 10/16/2009
Views: 5322
|
|
|
|
IMG_8806post
Date: 08/10/2009
Views: 6187
|
|
|
15 pin HD stick grip connectors 4.
Date: 11/10/2010
Views: 7203
|
|