|
DSCN5648Ann
Date: 04/02/2007
Views: 5462
|
|
|
magnet
Date: 11/16/2008
Views: 4524
|
|
|
Fuel_System_03
Date: 01/23/2006
Views: 7198
|
|
|
Vertex_ant_11
Date: 03/15/2009
Views: 5885
|
|
|
Door hinge rebates 46.
Date: 11/10/2009
Views: 4221
|
|
|
IMG_6299
Martien van Lievenogen maintains the engines of a B-25 bomber, so who better to help me with the installation?
Date: 12/23/2016
Views: 7808
|
|
|
101002_cowl
Date: 12/31/1969
Views: 3901
|
|
|
DSCN3657
Date: 01/26/2009
Views: 5064
|
|
|
IMG_3811ann
Date: 03/16/2009
Views: 5529
|
|
|
CH34_11
Date: 04/02/2006
Views: 4605
|
|
|
IMG_7933Ann
Date: 06/28/2008
Views: 4414
|
|
|
nex_2013_08_24_01
Stb. side ribs 3 and 4 epibond in place with the 3 layups on all sides. At this point I was getting faster at doing layups however I only did one side at a time.
Date: 08/25/2013
Views: 17288
|
|
|
IMG_1396
Had to shorten the new intercooler hose to allow everything to move to port. Repositioned the aluminum baffle and the intercooler and all fits now.
Date: 05/26/2011
Views: 4392
|
|
|
Airplane-Wrap 1.
Date: 07/10/2009
Views: 4544
|
|
|
CH18_09
Date: 12/31/1969
Views: 4344
|
|
|
UpInRafters02
Date: 11/29/1999
Views: 5343
|
|
|
DSCN6132
Date: 10/11/2009
Views: 4303
|
|
|
IMG_6450post
Date: 08/15/2009
Views: 4532
|
|
|
P1010018
Date: 12/31/1969
Views: 5426
|
|
|
Completion of Port top skin bond on 61.
Date: 09/22/2010
Views: 4744
|
|