|
|
DSCN4374Ann
Date: 05/06/2006
Views: 4975
|
|
|
DSC_0217
Date: 05/15/2008
Views: 4775
|
|
|
|
03112008228_G
Date: 10/27/2009
Views: 7251
|
|
|
Mollis_AB_Switzerland_2003
Date: 12/31/1969
Views: 4315
|
|
|
|
img0223copy
Date: 07/29/2007
Views: 4319
|
|
|
DSCF0037
Date: 03/02/2009
Views: 5051
|
|
|
|
Fuel_Tank_fittings
Date: 12/31/1969
Views: 7010
|
|
|
dscn2022
Date: 12/31/1969
Views: 4774
|
|
|
|
Bat1
Date: 01/15/2009
Views: 7061
|
|
|
DSCF0032_002
Date: 10/26/2009
Views: 4735
|
|
|
|
dsc09049
Layup Port side complete with peel ply. Notice the glad wrap to keep air from getting under the peel ply. 420 = 46g, aeropoxy ~ 200g
Date: 01/24/2013
Views: 19840
|
|
|
Front leveler 3 of 3.
Date: 08/12/2003
Views: 8671
|
|
|
|
Port_door_3_Y9_06_07
Date: 06/07/2009
Views: 5269
|
|
|
Graham 3 Europa aerofoil
Date: 09/10/2010
Views: 4677
|
|
|
|
012502_hinge_both
Date: 12/31/1969
Views: 4299
|
|
|
IMG_5899post
Date: 08/09/2009
Views: 5887
|
|
|
|
Aluminum Plenum flanges installed
Aluminum flanges were added to the plenums so that the plenums would not need to be fastened directly to the hot heads. Later in the build, the pop rivets were replaced with machine screws so that the front 2/3 of the plenum could be easily removed
Date: 01/01/2011
Views: 193477
|
|
|
Magnets and JB KWIK Weld.
Date: 01/21/2010
Views: 6270
|
|
|
|
PilotDoorIssue11Ann
Date: 05/17/2005
Views: 3754
|
|
|
110_1065_IMG
Date: 03/06/2004
Views: 11227
|
|